Mostrar el registro sencillo del ítem

dc.contributorUniversitat Ramon Llull. La Salle
dc.contributorNorth Dakota State University
dc.contributorNortfolk State University
dc.contributor.authorBanawi, Abdul-Aziz
dc.contributor.authorBesné Yanguas, Alia
dc.contributor.authorFerrandiz, José
dc.contributor.authorFonseca Escudero, David
dc.date.accessioned2020-11-20T06:27:45Z
dc.date.accessioned2023-10-02T06:26:46Z
dc.date.available2020-11-20T06:27:45Z
dc.date.available2023-10-02T06:26:46Z
dc.date.created2020-03
dc.date.issued2020-05
dc.identifier.urihttp://hdl.handle.net/20.500.14342/3148
dc.description.abstractThis paper proposes a proactive model to improve the overall performance of constructionprocesses. The main advantage is that potential waste and associate impacts could be identified in theearly stages of a project before the construction phase. To accomplish that, the model combines threemethods; Lean-to identify waste, Green to assess environmental impact, and Six-Sigma to measureand improve process performance (LG6). The LG6 model helps in evaluating processes one step ata time, identifying consumed resources, analyzing the environmental performance of all steps aswell as highlighting generated impacts, applying improving alternatives if needed, and measuringprocess performance for evaluation. The functionality of LG6 is illustrated through a case study ofwoodpiles installation. In this case study, the LG6 model identified four steps out of eight that areconsidered potential waste or (non-value-added steps) according to the Lean principles. As a result,the LG6 model helped in reducing impact by 9% and expenses by 1%. The LG6 model can help toimprove the performance of construction processes and reduces unnecessary waste.
dc.format.extent14 p.cat
dc.language.isoengcat
dc.publisherMDPIcat
dc.relation.ispartofSustainability, 2020, Vol. 12, No 10cat
dc.rightsAttribution 4.0 International
dc.rights© L'autor/a
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/
dc.sourceRECERCAT (Dipòsit de la Recerca de Catalunya)
dc.subject.otherConstrucció sosteniblecat
dc.subject.otherArquitectura sosteniblecat
dc.titleA Three Methods Proactive Improvement Model for Buildings Construction Processescat
dc.typeinfo:eu-repo/semantics/articlecat
dc.typeinfo:eu-repo/semantics/publishedVersioncat
dc.rights.accessLevelinfo:eu-repo/semantics/openAccess
dc.embargo.termscapcat
dc.subject.udc504
dc.subject.udc69
dc.subject.udc72
dc.identifier.doihttps://doi.org/10.3390/su12104335cat
dc.relation.projectIDinfo:eu-repo/grantAgreement/SUR del DEC/SGR/2017-SGR-934cat


Ficheros en el ítem

 

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution 4.0 International
Excepto si se señala otra cosa, la licencia del ítem se describe como http://creativecommons.org/licenses/by/4.0/
Compartir en TwitterCompartir en LinkedinCompartir en FacebookCompartir en TelegramCompartir en WhatsappImprimir